The \u201cHybrid DH DEMO\u201d project aims at developing various business models in connection with wind energy for a hybrid district heating system at the Neusiedl am See site and to test them in practice. The focus is on an open innovation approach and intends to integrate the town Neusiedl and its citizens based on the principle of the \u201cUrban Living Lab\u201d. <\/p>\n
At the center of the investment project is the energy hub Neusiedl, where the district heating center, the natural gas network, and the public electricity grid converge and which is\u2014through technical extensions\u2014to be made into an \u201cenergy hub\u201d. The plan is to install a flue gas condensation heat pump (1 MWth), an air-heating pump (1 MWth), an expansion of the buffer storage tank (to 300 m\u00b3), a battery storage (700 kWh) and a direct line between the wind farm and the heat center. The project \u201cHybrid DH DEMO\u201d aims to achieve the following results:<\/p>\n
The project is based on the results of the two previous exploratory projects \u201cWindvermarktung\u201d and \u201cHybrid DH\u201d.<\/p>\n
\u00a0<\/p>\n