The “Hybrid DH DEMO” project aims at developing various business models in connection with wind energy for a hybrid district heating system at the Neusiedl am See site and to test them in practice. The focus is on an open innovation approach and intends to integrate the town Neusiedl and its citizens based on the principle of the “Urban Living Lab”. At the center of the investment project is the energy hub Neusiedl, where the district heating center, the natural gas network, and the public electricity grid converge and which is—through technical extensions—to be made into an “energy hub”. The plan is to install a flue gas condensation heat pump (1 MWth), an air-heating pump (1 MWth), an expansion of the buffer storage tank (to 300 m³), a battery storage (700 kWh) and a direct line between the wind farm and the heat center. The project “Hybrid DH DEMO” aims to achieve the following results:

  • “Energy hub” business models based on the open innovation approach
  • High acceptance of the business models thus developed
  • 20% reduction in the number of wind turbine shutdowns at Energie Burgenland
  • An increase in the proportion of renewable energy in the energy mix (excluding fuels) of the town Neusiedl by 5%.
  • 2% optimization of the district heating system aim to reduce losses.
  • Economic, technical, and ecological optimization of the energy flows within the “energy hub”
  • The needs of the town are reflected in the applications
  • Stabilizing the cost of district heating in comparison to the production cost of alternative projects

The project is based on the results of the two previous exploratory projects “Windvermarktung” and “Hybrid DH”.

Visit Project Website

Contact

Alois Kraußler
T: +43 664 88500339
E: alois.kraussler@4wardenergy.at

Project key facts

Duration
01.03.2019 - 28.02.2023

funding program
SmartCities Demo

Project type
Cooperation project experimental development

Project budget
1.282.694 €

Project management

4ward Energy Research GmbH

The following model solutions are being developed in the Hybrid DH DEMO project:

FLEXIBILITY FOR WIND ENERGY
WIND TO HEAT
BUSINESS MODEL WIND TO HYDROGEN

Media reports on the project

Burgenland: world's first power2heat plant combines wind power and district heating - Land Burgenland

In Neusiedl am See, a new type of plant generates sustainable heating for 1,000 households by combining electricity and district heating

To the article
Worldwide unique "power2heat" plant - burgenland.ORF.at

A "power2heat" plant was presented and put into operation in Neusiedl am See on Thursday. This plant produces heat from wind power. It is a globally unique project, it was said at the commissioning ceremony.

To the article
Die Presse: A city brings a breath of fresh air to its district heating network

Neusiedl am See demonstrates how green energy can be used optimally: Wind power can be used to generate electricity, heat or hydrogen locally as required. This supports the policy of phasing out the use of fossil fuels.

To the article
Green Energy Lab projects complement power2heat system

The ground-breaking ceremony for Energie Burgenland's major project took place at the beginning of May 2019. power2heat is based on an existing biomass heating plant and district heating network. To enable the plant to produce heat from wind power in future, a line will be laid from the substation to the heating plant.